Hotel Kids Area Lead Time and Payment Milestones
Lead time is counted from drawing approval and covers production only. Work backwards from the date the container has to be ready to ship, then add your own freight and installation window on top.
Your project inputs
Configuration
Drawing rounds
Ship-ready date
Contract value
Your timeline
Production window
—After drawing approvalDrawing approval to ship-ready
—Includes the drawing rounds you allowedLatest drawing approval
—Counted back from your ship-ready dateMilestones in order
| Milestone | Timing | What we need from you |
|---|---|---|
| Written quotation | Within 48 hours of receiving drawings | Floor plan, measured clear height, age bands, star rating |
| Layout and drawing approval | — | Sign-off on the layout and the equipment list |
| Production starts | 30% deposit | Deposit released against the approved drawings |
| Production and final check | — | Nothing; we check the equipment list against your measured room first |
| Balance before loading | 70% balance | Payment before the container is loaded |
| Handover pack | Ships with the order | Installation drawings, assembly manual and installation video guidance |
| Warranty | 12 months | Against manufacturing defects |
Payment split
Enter a contract value above to split it into the 30% deposit and the 70% balance.
What is not in this timeline
We quote FOB by default, with CIF or EXW on request. Sea freight, clearance and local installation labor sit outside the production window and are scheduled backwards from your opening date.
Lock the dates in the quotation
Terms and dates are confirmed in the written quotation. Send drawings with your target ship-ready date and we return the quotation within 48 hours.