Landed Cost Calculator | DreamlandPlus

Landed Cost Calculator

A factory quotation is not what the project costs. This works the published trade figures against your own numbers so the gap is visible before you sign anything.

Your factory quotation
Your own figures, if you have them

Leave these at zero and the calculator falls back to the published 25 to 45 percent uplift band instead of itemising.

The pre-filled 4 percent is the base rate only, and it is not necessarily what a United States importer pays on Chinese-origin goods. CBP ruling N300929 classified children’s playground equipment from China under HTS 9506.99.6080 at 4 percent ad valorem and the current tariff schedule still shows 4 percent, which is why 4 is pre-filled. What sits on top of it has moved twice in 2026. Three Chapter 99 additions worth 37.5 points between them applied to this subheading as late as October 2025; Executive Order 14389 of 20 February 2026 ended the emergency-powers duties behind most of that, and a 10 percent global surcharge introduced the same day expired by statute on 24 July 2026. Section 301 duties survived both changes and further Section 301 action has been reported since. None of it is hard-coded here, for exactly that reason. Get the stack that applies on your own entry date from your customs broker and type that number into the duty field before you budget from anything on this page.

A published project, itemised

One useful check on any estimate is a real project someone published in full. A KOMPAN kindergarten project is published at $120,300 total on 2022 United States pricing:

KOMPAN kindergarten project, 2022 United States pricing
LinePublished amountShare of total
Products$83,00069.0%
Installation$18,00015.0%
Surfacing$10,5008.7%
Freight$8,8007.3%
Total$120,300100%

A generic budget split is published for this market at equipment 60 percent, surfacing 20 percent, amenities up to 10 percent and installation 10 percent. The itemised project above does not match it. Treat generic percentage pies as a sanity check on the order of magnitude, never as a budget.

Request a quotation →

Our trade terms are EXW, FOB, CFR, CIF, DDU and DDP, and payment is a 30 percent T/T deposit with the balance before loading, or L/C at sight on large orders. Which term you buy on decides how much of the table above is already inside the quotation.