Get in touch with Dreamland Playground Company
FEC Attraction Space Planner
Allocate measured usable area before selecting equipment. The tool shows a planning balance; it does not validate capacity, code, accessibility, circulation, or attraction use zones.
Area allocation
Space balance
Allocated: 0 ft²
Remaining: 0 ft²
Review the balance with a measured plan and qualified local professionals.
Discuss the Floor PlanReview prompts
- Confirm clear height, columns, doors, exits, restrooms, utilities, structure, and loading access.
- Map arrival, check-in, waiver, queue, play, party, food, seating, restroom, and exit flows.
- Keep accessible routes, maneuvering spaces, use zones, staff sightlines, and emergency access visible.
- Reserve service access for cleaning, maintenance, replacement, storage, waste, and future changes.



